2 ms·
Much of the work currently done is grade separation for the existing freight and future high speed rail. Also something like half the cost of the CalTrain elect
by Gibbon1 4y ago
Much of the work currently done is grade separation for the existing freight and future high speed rail. Also something like half the cost of the CalTrain electrification was paid for by the CHSR project.