4 ms·
They tack that $75 on per unpaid toll. So you drive the length of the tollway and pick up 9 of them, that's 9x$75 or $675. Then you drive back in the evening.
by LanceH 4y ago
They tack that $75 on per unpaid toll. So you drive the length of the tollway and pick up 9 of them, that's 9x$75 or $675. Then you drive back in the evening. Do that for a couple weeks before the mail arrives.