4 ms·
The way I've heard it phrased is "If the physical properties of concrete changed every two years, civil engineering would look a lot different." (forget the sou
by ethbr0 4y ago
The way I've heard it phrased is "If the physical properties of concrete changed every two years, civil engineering would look a lot different." (forget the source)