4 ms·
The infrastructure is already materializing. >50% of the 119k public charge points in NL were installed within the past 2 years, providing their services to 328
by mattashii 4y ago
The infrastructure is already materializing. >50% of the 119k public charge points in NL were installed within the past 2 years, providing their services to 328k BEVs.
And if you don't ever want to wait for a charge, then you can often use public transit, or ride a bike.
- _hypx 4y agoYou will need millions, and that includes a vast number of fast chargers plus grid upgrades.
- Kukumber 4y agoit's mentioned that it's 0 emission cars 0 emission cars aren't just EVs you have fuel cells too with hydrogen by 2035, lot can happen https://www.youtube.com/watch?v=2WeoeJyJmN4&t=455s https://www.youtube.com/watch?v=2WeoeJyJmN4&t=455s
- _hypx 4y agoThe saving grace is that there could be alternative options. But the law should allow for even more options, such as eFuels. The way it is written is not particularly open-minded or designed in a feasible way. 2035 is not very far off for the type of infrastructure changes needed. This will have be a landslide of investment, and it could all go to waste regardless.
- Pigalowda 4y agoSo what you’re saying is there’s a huge business opportunity here for sweet government corrects Ava subsidies?