My understanding is that the process is moving forward quite well, it's the design teams that are struggling to deliver on time. Meteor lake is a big step up i
by locustous 4y ago
My understanding is that the process is moving forward quite well, it's the design teams that are struggling to deliver on time.
Meteor lake is a big step up in efficiency but will be a regression in performance. Another reason to cancel the desktop variant.
- analognoise 4y agoIn a vacuum that would be a win. AMD is executing on performance and efficiency simultaneously; a perf regression on Intel parts would be a disaster.
- adrian_b 4y agoBecause Meteor Lake is expected to have a greater IPC than Raptor Lake, reducing the gap towards the Apple CPUs, any regression in performance can be caused only by a clock frequency during a power-limited scenario that is lower than estimated when the Meteor Lake design has started, which is the same what has happened with the Intel "10 nm" process during the Cannon Lake/Ice Lake/Tiger Lake years, until Intel eventually succeeded to tweak their manufacturing process and design rules enough to be able to obtain a better performance than with their old process. This means that Intel 4 is still not moving forward well enough, at least not as well as they had predicted at the start of the Meteor Lake project. Hopefully for a healthy competition, this time they will succeed much faster to tune their manufacturing process.
- locustous 4y agoIntel has had process problems. I don't think those continue to be their primary issues. It wasn't process problems that kept sapphire rapids from being released till now. 10nm/Intel 7 has been ramped up and fabbing products for over a year. They are very late on critical products that are clearly not the fault of the foundry side. This is squarely on the design side. Running good engineering orgs is hard, Intel's problems run deep and on many levels.
- ksec 4y agoFew extra notes. The original Sapphire had to be "redesigned" ( or reworked ) for Intel 7. You cant just take an high yield Intel 7 Golden Cove Core and "Edit" it with some extra features for server and then expect it yield. Second being Intel 7 isn't exactly high yield either. At least not 14nm level. It is good enough for small die size chips, but it is something different for large die size ( Aka Sapphire Rapid ). Which is why the comparison between Intel and AMD on server market doesn't make sense. They have a very different economy of scale. Third being Intel doesn't put resources in Intel 7 any more. It is no longer a priority. They are losing one way or another that is why they put everything into their next node Intel 4. Intel is expecting Intel 3 in 2023 and products out in 2024, this isn't too far behind TSMC schedule.
- locustous 4y ago> The original Sapphire had to be "redesigned" ( or reworked ) for Intel 7. You cant just take an high yield Intel 7 Golden Cove Core and "Edit" it with some extra features for server and then expect it yield. All the other products that shipped on Intel 7 had to also be designed for the process. Intel was also late on arc, which wasn't even fabbed on Intel process nodes. Ponte Vecchio... Late late late.