3 ms·
If I were a train-building contractor, I'd send someone with a laser rangefinder to a few of the actual stations to double-check the official figures. And also
by nine_k 4y ago
If I were a train-building contractor, I'd send someone with a laser rangefinder to a few of the actual stations to double-check the official figures. And also to every tunnel.
Unless these errors are going to be fixed at the expense of the government / railway company. not the manufacturer, of course. (Sad laughter.)
- fredoralive 4y agoIf you build it to the specs and standards provided, I'm not sure how you'd be liable. It's the clients mess up. However I do wonder if the modern ability to do very precise manufacturing means that designs now often just push to the absolute limit of the standards. A few decades ago there would be be a bit of margin left in for error, but now we can hit the limits of the envelope fairly precisely. Which means the infrastructure needs to do the same...
- TuringTest 4y agoIn fact the providers didn't follow the procedure established by contract, which required them to measure the actual size of the ancient tunnels instead of relying on standard measures (which by law were required to be established following modern standards; they knew they would not be valid for the actual project, that's why they asked for an investigation to find out the actual size needed). [1] The delay is not caused by any mistake, despite what the press and politicians said; it's being caused by the established security protocols being followed (for one) to avoid a catastrophe (which has happened in the recent past for not being followed). 1 - https://twitter.com/unodelarenfe/status/1623588179520413696?s=20 https://twitter.com/unodelarenfe/status/1623588179520413696?...