4 ms·
Installed capacity for solar panels in a location so up north is, simply, a lie. It will be reached a few days a year at most, at a time when demand is lowest.
by himinlomax 4y ago
Installed capacity for solar panels in a location so up north is, simply, a lie. It will be reached a few days a year at most, at a time when demand is lowest.
1 GW of nuclear means 1 GW all the time outside of maintenance periods, or something like 900 MW on average, conservatively.
1 GW of solar means 20 MW on average.
- Schroedingersat 4y ago780GW on average. With long correlated outages. And half of your power generated when noone wants it. And winter europe CF for solar is still above 8%, 17% is world median.
- himinlomax 4y agoThat was a once in several decades outage.
- Schroedingersat 4y agoIt happens all the time. Multiple plants get shut down for a related issue.