3 ms·
Make sure to have them point out each task ahead of time and then get upset if they take longer than the allocated points
by swagasaurus-rex 4y ago
Make sure to have them point out each task ahead of time and then get upset if they take longer than the allocated points
- flavius29663 4y agoalso, get upset if their estimates are too high. They are agile, they should finish things faster