4 ms·
I have 100k miles on my 2018 Model S having Supercharged it the majority of the time the last four years. It has only 6% battery degradation of the 100kw pack.
by toomuchtodo 4y ago
I have 100k miles on my 2018 Model S having Supercharged it the majority of the time the last four years. It has only 6% battery degradation of the 100kw pack. Tesla warranties their powerwalls for 15 years when configured as part of their aggregated virtual power plants. The batteries are demonstrated to be durable.
New LFP chemistries that are heavier but more stable are ideal for stationary storage and high cycle counts, but the evidence shows in general that these packs are built for longevity (with very occasional early failures). You could probably do well buying a salvage Tesla and shucking the pack for working modules and coming out ahead economically (safety warning, do at your own risk, etc) if you don’t want or can’t get dedicated stationary storage (although it comes with generous federal, state, and utility subsidies in California).
- danans 4y ago> if you don’t want or can’t get dedicated stationary storage (although it comes with generous federal, state, and utility subsidies in California). I installed stationary LFP batteries (from Enphase) on my house in CA 1.5 years ago, but I then discovered that the state and utility subsidies [1] only apply if you are in a very low income (for CA) bracket, have a health condition that requires backup power, or live in a high fire risk zone. I don't qualify for the first 2 categories, and my luck is that the high fire risk zone starts about a mile away from my house, so good from the fire risk perspective, but not for the subsidy. Still got the 26% federal tax credit (with IRA, it's now back up to 30%). 1. SGIP: https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/self-generation-incentive-program https://www.cpuc.ca.gov/industries-and-topics/electrical-ene...
- deleted 4y ago[deleted]
- mercutio2 4y agoHow do you like your Enphase batteries? I was pondering buying them, already have Enphase solar. I'm particularly interested in whether you're doing any load-shifting with them, and if so, how easy it is to do with the software. I'm paying $.90/kWh at summer peak, so while I'm still on net-metering, I'm somewhat interested in going ahead and fully arbitraging during peak.
- danans 4y ago> How do you like your Enphase batteries? I'm mostly happy with them. The batteries are pretty much set-and-forget, but I change the reserve level by season (90% in winter, 30% in summer). The system automatically decides how to do load shifting to optimize for your particular rate structure. I will say the monitoring software can be janky at times. It's gotten better, but sometimes it is very slow to connect to the system. > I'm paying $.90/kWh at summer peak Whoa, where is that? That's 2x more expensive than California or Hawaii. You must be on a wholesale rate plan with very low off-peak rates if you are considering arbitrage. It's also good that you waited until this year, because before the IRA, the residential battery tax credit was only available if you charged it with on-site renewables, not from the grid. I don't do any grid arbitrage in the sense of buying low and selling back to the grid from my batteries when rates are high. That's not possible for homeowners in CA, is it in your area? However, several places in Southern California already have home-battery based virtual-power-plants that you can participate in, and I think it integrates with Enphase batteries. In those programs, the arbitrage is managed by a 3rd party company which then compensates the homeowner. However, my evening loads during the peak rate hours do draw on my battery until it hits its reserve level, so what I do is more like peak-rate avoidance than arbitrage. My batteries also don't charge from the grid, just from my PV array. With subsidized net-metering 2.0, the difference between peak and off peak for me is only $.07/kWh, so there's really not a ton of economic value there, maybe like $70-80/year at most.
- mercutio2 4y agoI live in Berkeley. PG&E’s peak EV-A rate for generation plus distribution was $.92 this summer. It doubled in a year or two. My off peak rate for charging the car went from net $.15/kWh to $.36 during the summer. It’s news to me that load shifting (if you’ve got batteries and solar) isn’t allowed by the CPUC, that does take the wind out of my sails a bit. But the peak rates are so high that just zeroing out my peak consumption is still probably worth it. Does the system come with a “disconnect from the grid during emergencies” shunt? I’ve heard conflicting reports about the availability and legality of those systems.
- 4y ago
- nkingsy 4y agoGood to hear about the S. I just got a used model X with free unlimited supercharging. Tesla doesn't recommend supercharging for around town use, which is strange considering it only goes over 1C for 5 minutes or so and only barely over, with active cooling. The other strangeness for me is the recommendation to stay between 50 and 90 for daily use. Studies of li-ion have shown 80-20 to be the optimal usage pattern for maximizing usable watts over the life of the battery.
- toomuchtodo 4y agoBattery warranty is 8 years unlimited miles, so I don’t put much thought into pack health. Enjoy your spaceship.