2 ms·
The North Sea Link between Norway and the UK is already up and running and has a capacity of 1.4 GW. It is currently (10:53 UTC) supplying 3% of the UK load.
by kwhitefoot 4y ago
The North Sea Link between Norway and the UK is already up and running and has a capacity of 1.4 GW. It is currently (10:53 UTC) supplying 3% of the UK load.
See https://gridwatch.templar.co.uk/ https://gridwatch.templar.co.uk/