4 ms·
I assisted with a few residential electrical-service upgrades last year (in California). ...If the plumbing pipe could be used as one of two paths to ground (i.
by mcbishop 4y ago
I assisted with a few residential electrical-service upgrades last year (in California). ...If the plumbing pipe could be used as one of two paths to ground (i.e. conductive all the way), it was. Otherwise two grounding stakes were installed instead of one.
> by code, plumbing repairs couldn't leave behind unbonded sections of conductive plumbing
I assume that's correct, but I think shady / lazy / amateur contractors can assume the inspector won't check work in the crawl space.
- Animats 4y agoToday it's more like you're bonding the plumbing to ground than assuming it is ground. That way, if something shorts to a pipe, you trip a breaker rather than energizing the water system.