If you need to upgrade your service entrance, if it's within your means, go to 400A to future proof (EVs, HVAC and hot water heat pumps, induction stove, and ot
by toomuchtodo 4y ago
If you need to upgrade your service entrance, if it's within your means, go to 400A to future proof (EVs, HVAC and hot water heat pumps, induction stove, and other large loads all add up, along with colocated generation of some sort). Depending on your authority having jurisdiction (AHJ) and utility, they may require a licensed electrician to replace the raceway or similar entrance to the meter. 200A is satisfactory if greater amperage isn't available (US centric advice). Think of this as the residential version of "dig once" [1].
EDIT: Yes, you may not need 400A immediately, but if you're doing an upgrade, the cost delta between the conductors for 200A vs 400A is not substantial except for very long runs. Also, some utilities will cover the cost of a service upgrade to the meter; from the meter onward into the home is your cost. Balance cost with future needs, future labor costs, etc. Very similar to dropping a whole bunch of cheap fiber in a trench just in case you need it in the future.
I usually recommend people combine this work with a solar PV install, to capture the 30% federal tax credit towards the work (if you can justify the upgrade as necessary, which you can if your current service is less than 200A), as it has no limit on the amount you can capture as part of the install (versus the previous tax credit for electrical upgrade costs for installing an EV charging station).
[1] https://www.fhwa.dot.gov/policy/otps/policy_brief_dig_once.pdf https://www.fhwa.dot.gov/policy/otps/policy_brief_dig_once.p...
- UI_at_80x24 4y agoThis is double-great advice. It's completely obvious once mentioned but not something that may have occurred of the top of ones head. Thank-you for posting.
- bombcar 4y agoIt's strange because 400a service will probably NOT ever be needed, but the cost difference from 100-200 and 100-400 is basically nothing. You can also get a separate meter installed instead or alongside, this can be useful it the property could be dual purpose (think: duplex, house + machine shop, etc). This can increase costs because of double baseline but it can also reduce costs because of double "low tier" - depends on the market.
- signaturefish 4y agoI always forget the size difference between US and UK homes (I assume toomuchtodo is speaking from a US perspective). Here, in my three-bedroom UK house I'm on a 60A service fuse and considering updating to 100A in the future (amusingly, as part of a solar PV / electric vehicle charger install). I've never heard of a UK house having a larger than 100A service (although I imagine they exist here and there - it's certainly not common).
- SketchySeaBeast 4y agoI'd never heard of a 400 A service until just this discussion (it's common to have 100 A - 200 A), but it's important to keep in mind the voltage differences and that effect on total power: UK: 100 A x 230 V = 23,00 W US: 200 A x 120 V = 24,00 W Edit: I am wrong in my understanding of US power distribution. It's 200 A per leg, which the US has two of. But it seems like the UK may or may not have 380 3 Phase, so the numbers are weird there too. Wrong all around!
- throwawayacc3 4y agoVoltage to residential main electrical service panels in the United States is 240V. Major appliances run on 240V circuits. So when you install a 400A panel in the US, it's 400A*240V which is 96,000W.
- kuschku 4y agoAnd service in EU is 380V, so the relationship between the numbers remains similar.
- throwawayacc3 4y agoThat is incorrect. The EU/UK are on 230V at 50Hz at residential service entry.
- kuschku 4y ago
- danans 4y ago> if it's within your means, go to 400A to future proof (EVs, HVAC and hot water heat pumps, induction stove, and other large loads all add up, along with colocated generation of some sort I have all of these on 200A with amps to spare. But I have a small house. I suppose if I had multiple EVs, dryers, or heat pumps, or 3000sqft it would be a different story.
- rsync 4y agoAgain, see above - it's not about 400 amps per se ... it's about putting in bigger wire because we can't predict the future. It's spending a small additional amount now (on wire) to avoid an enormous expense (trench digging) in the future. Oh, and you know that 3" conduit required for the 400amp ? Make it 4". Oh, and you know that trench you just dug ? Throw in double 1.5" and double 3/4 conduits right in there with it. Oh and you know that first two feet of dirt you filled in ? Now throw two more 3/4 conduits on top of that because you never know when a common carrier on that same pole will have fiber up on it ... Future you will be very happy you did.
- danans 4y ago> Future you will be very happy you did. The future could also look like large batteries on-site that charge slowly, and then provide power at high amperage when needed, like slowly compressing a spring, then suddenly releasing it. This is already what Electrify America and Freewire (https://freewiretech.com/ https://freewiretech.com/) are doing with EV Fast chargers when the electric utility can't provide a higher power connection in a reasonable time-frame. As battery prices drop, that could be a viable way to power heavy home appliances.
- symfoniq 4y agoGood advice. I just did the 400 amp upgrade. Our 3200 sq ft house was still on 150 amp service from the 1980s, and going to 200 amps just didn’t seem to add much capacity relative to the cost. Was about $12K to go to 400 amps with two 200 amp panels.
- deleted 4y ago[deleted]