13 ms·
Only $2.3 billion is for construction of the express lanes, so $100 million per mile. And it’s not like with like. The Silver line was constructed on an existin
by rayiner 4y ago
Only $2.3 billion is for construction of the express lanes, so $100 million per mile. And it’s not like with like. The Silver line was constructed on an existing median that had been reserved for it decades ago. The I-66 express lane expansion required buying more land alongside the existing right of way.
The 4 new express lanes will also carry 5,000 vehicles per hour in each direction, which is as much as the total ridership of the Silver Line (outside the Beltway) in an entire day. Also, the actual cost to the state will be much lower. People highly value point to point driving access. So the express lanes can charge tolls up to $40.