3 ms·
Are you accounting for all the overhead? Commute time, vehicle maintenance, tool costs, having material stock on hand for any and every type of breaker or conne
by AngryData 4y ago
Are you accounting for all the overhead? Commute time, vehicle maintenance, tool costs, having material stock on hand for any and every type of breaker or connector or wire they might possibly need, the time spent on the phone lining up jobs and bidding jobs and everything else.
Also retrofitting into older unknown shit is WAY more of a pain in the ass than doing new construction too. So if I have enough work to do 40 hours on new construction, im not even going to entertain something like retrofitting a new panel into an older electrical system unless the pay is significantly higher.