4 ms·
What are the odds we find out software was mostly outsourced to "best cost countries" for "software engineers" making 9$/h? The planes they fly were built that
by 908B64B197 4y ago
What are the odds we find out software was mostly outsourced to "best cost countries" for "software engineers" making 9$/h?
The planes they fly were built that way [0], no reason their scheduling system isn't!
I'm starting to think we should have a list of companies with brittle software to avoid...
[0] https://www.bloomberg.com/news/articles/2019-06-28/boeing-s-737-max-software-outsourced-to-9-an-hour-engineers https://www.bloomberg.com/news/articles/2019-06-28/boeing-s-...
- ratg13 4y agowe've already learned that the problem was that the software wasn't connected. the flight planning and crew scheduling software was not connected. the flight planning software assumed the crews made their flight, and when they didn't the crews had to call and get the flight planning software manually updated. the call center to handle the manual updates got overloaded, the crews were put on hold for long periods of time, the crews 'timed out' due to all of the over work, the planning fell apart. this was a lack of investment in their infrastructure and running things on a shoestring. 100% management's fault, as all of these problems were well known but never addressed.