2 ms·
Professional developer here, working with some of the best build systems on the planet–distributed, cached, the whole nine yards. In the past I worked as an iOS
by saagarjha 4y ago
Professional developer here, working with some of the best build systems on the planet–distributed, cached, the whole nine yards. In the past I worked as an iOS engineer for a project which would benefit from mold. You are very wrong about how to produce impact at scale.
When your actual job is dependent on the build completing there’s not a whole lot you can do in the 5-10 minutes it takes to complete. You can skim a bit of email but there isn’t actually much you can do during that time that has lasting impact. I know, because I worked on projects like these on the side: precisely because this time was difficult to schedule stuff into, you’d save hundreds of thousands of dollars per year for each minute you reduced build times. I made a handful of these changes and they were always in longer stretches of slack time, such as when I was waiting for approvals to go through. There’s not much you can do in five minutes but it is very valuable for it to be turned into two minutes.