3 ms·
You'd still lose use of the existing tunnel. Why not build a new second tunnel?
by dylan604 4y ago
You'd still lose use of the existing tunnel. Why not build a new second tunnel?
- komadori 4y agoIf you want to increase the loading gauge of a railway, it may be expensive/difficult to reroute the track to go through a different tunnel. Also, making the track less straight may impair the maximum speed of the line.