4 ms·
Yes. He pretends to work on tickets in a sprint to justify attending. I think he's in a power struggle with the PM as we don't really need a PM with the work lo
by switch007 4y ago
Yes. He pretends to work on tickets in a sprint to justify attending. I think he's in a power struggle with the PM as we don't really need a PM with the work load we have, he could do his job.
And the PM loves to jump in to dev conversations that he doesn't understand on Teams too.