> Many fusion designs are 10 magnitudes away or more. JET Tokamak was within a factor of 2 and ITER will overshoot by a factor of 10.
by mjfl 4y ago
> Many fusion designs are 10 magnitudes away or more.
JET Tokamak was within a factor of 2 and ITER will overshoot by a factor of 10.
- gertlex 4y agoI think you and the parent poster may be talking about different "goals". My lazy quick skim of the main article here is that NIF has achieved a Q value of 1.2 presently. ITER is aiming for a Q of 10 [0]; i.e. Q=10 means fusion outputting 10x the input energy, which is (by some considered) roughly enough to break-even in energy production [1], i.e. to recapture 10% of that energy (as heat or as electricity, not sure...) So parent poster saying NIF is an order of magnitude away means Q=1.2 -> ~Q=10 And ITER seeking Q=10, means that's the goal that NIF is an order of magnitude away from, according to the parent poster. [0] Q=10 for Iter: https://www.iter.org/sci/Goals#:~:text=ITER%20is%20designed%20to%20yield,MW%20of%20input%20heating%20power https://www.iter.org/sci/Goals#:~:text=ITER%20is%20designed%.... [1] Q=10 is a rough minimum for energy production (quick and dirty source from google) https://www.powermag.com/fusion-energy-is-coming-and-maybe-sooner-than-you-think/#:~:text=Q%20%3D%201%20represents%20the%20breakeven,above%2010%20to%20be%20economic https://www.powermag.com/fusion-energy-is-coming-and-maybe-s....