3 ms·
(The GP was using the US convention to refer to the two dates 01/02 and 02/01, not trying to use two conventions to refer to a different date each.)
by Smaug123 4y ago
(The GP was using the US convention to refer to the two dates 01/02 and 02/01, not trying to use two conventions to refer to a different date each.)
- fcarraldo 4y agoAh, I see. Apologies to GP, but I believe the point is still reinforced - the biggest enemy of an engineer when it comes to dates is ambiguity.