4 ms·
So those 1000 lines of code (your prototype was 100 lines and this was 10x that) would still have been a week tops, right? That doesn't seem too bad a price to
by WJW 4y ago
So those 1000 lines of code (your prototype was 100 lines and this was 10x that) would still have been a week tops, right? That doesn't seem too bad a price to pay for scaling potential, even if in hindsight it wasn't needed. You can't always know in advance which features you are going to need and which ones are superfluous.
- shakow 4y agoIf what you need is a simple work queue, you really need to scale very far away (in the magnitude of several thousands of requests per second) to overgrow a solution built on top of PostgreSQL.