3 ms·
The (literally) central part of the project is a railway running through the whole length. I'm no construction expert, but building the railway first so you ca
by BurningFrog 4y ago
The (literally) central part of the project is a railway running through the whole length.
I'm no construction expert, but building the railway first so you can use it to ship material and workers seems like it could be good.
- jaclaz 4y agoNot only. I have no idea on what the project details are, but - generally speaking and if possible - building an open-cut tunnel (as opposed to bored) is much cheaper (like 1/3 of the cost) and much faster (also because the works are not sequential and can thus be carried on easily in multiple stretches at the same time, given enough equipment and workers ).