2 ms·
Anything that gets between what me, the designer, and the PM want to do needs to go. There’s an entire industry of bullshit around framing and tracking that fun
by ramesh31 4y ago
Anything that gets between what me, the designer, and the PM want to do needs to go. There’s an entire industry of bullshit around framing and tracking that fundamental working unit which actually builds software. Project managers, Scrum masters, whatever. If you really need acountability to the bean counters, let them define their own KPIs and give me and the PM an interface to them. Anything else is a total waste of time and effort.
- drewcon 4y ago
- SgtBastard 4y agoThis comment is beneath HN. AMZN (amongst numerous other household name brands) ships world class products with 2-pizza teams where a dev, a designer and a product manager are having the conversations that need to be had to ship. Do better.