3 ms·
They need a lot of water initially but recycle it as they operate. Intel and ASML already have facilities in Arizona. I'd assume TSMC chose partly based on tha
by jasonwatkinspdx 4y ago
They need a lot of water initially but recycle it as they operate.
Intel and ASML already have facilities in Arizona. I'd assume TSMC chose partly based on that allowing them to hire out of the local talent pool, along with incentives from the state.