You're cherry picking the data I cherry picked to help you again. P919 says the average cost was $589/kW in 1983 dollars with $120/kW of non-TMI retrofits and c
by Schroedingersat 4y ago
You're cherry picking the data I cherry picked to help you again. P919 says the average cost was $589/kW in 1983 dollars with $120/kW of non-TMI retrofits and costs rose with time rather than going down. In the hypothetical where this is in some way related to somethint that could happen now this is $3600/kW vs a renewable blend in germany of $3400/kW. If we take the last few from each manufacturer that opened before 1979 and don't add retrofit costs it's about the same. Your argument about positive learning rates doesn't fit the data even slightly.
Your absolute best argument if I shuffle the goalposts all the way along for you and ignore the guaranteed money, the abandoned plants, the shutdowns that occured under a decade after opening (all of which were paid for on the public dime) the military and govt involvement and the lack of liability is that undoing 37 years of safety and efficiency improvements and reproducing reactor designs with similar capacity to wind and a much higher correlated forced outage rate to a renewable blend sans storage will allow you to come in at only 7% over the cost and only 4-6 years later?
Then even after all that, operating it for two decades will cost more than the total cost of the renewable system.
All this in a country with mediocre wind and worse solar resource than Alberta, Canada. This is your argument?
- Manuel_D 4y agoWhatever "TMI retrofits" which you keep referring to (yet never actually backing it up with a source) are likely not necessary: 3 mile island's secondary containment worked and prevented any significant amount of radiation release. Estimates you're giving for renewables are excluding the cost of storage, or using fanciful figures of 4 hours worth of storage, as well as excluding costs of transmission and load shifting. > In the hypothetical where this is in some way related to somethint that could happen now this is $3600/kW vs a renewable blend in germany of $3400/kW. If we take the last few from each manufacturer that opened before 1979 and don't add retrofit costs it's about the same. No, it doesn't. It comes out to $1600/kW. Average capacity factor of nuclear power is over 90%, not the 50% you claimed earlier. And again, your "renewable blend" omits the cost of storage, which will be immense if we're even able to build storage at the scale required at all.
- Schroedingersat 4y agoThe retrofits are reliability and safety upgrades excluding those that happened as a result of TMI. P920 in the Phung paper I linked. This adds about $120/kW or $200/kW net in 1983 dollars. You don't get to use the price excluding 40 years of reliability and safety upgrades since TMI in one of the strictest nuclear regulatory regimes with tens of billions of tax money spent on the public share of enforcement, and the performance including those upgrades. A Ford Pinto isn't a 2022 Lambourghini. The prices are costs pre-tmi. The 58% is the lifetime capacity pre-tmi. If you want to use 92%, then find and source the cost of retrofits and interruptions between 1979 and 2022, as well as the cost of replacing all the plants that closed early and the cost of abandoned plants. At 58% capacity factor with ~20% forced outage rates you are going to have many, long, correlated outages. The renewable blend isn't as reliable as the modern fleet, but the 1979 fleet needs more storage, more backup, and more transmission to distribute the overprovision to where it is needed. If you don't want to prevent more TMI incidents by adding all the stuff that happened after, you're also going to have to throw in a billion every 20 years or so to pay for cleanup and replacing the lost generation capacity. Alsk keep in mind that on the list of reactor prices from 1968 to 1979, the prices went up the entire time. Your learning rate is negative even in the Nuclear boom. This alone is enough to disprove your assertion that the cost difference is due to lesser construction.
- Manuel_D 4y ago> $200/kW net in 1983 dollars. So, it adds less than 200 million dollars per GW of storage. This is not large. It's also misleading to portray retrofitting plants as an expense that new nuclear builds would require: it's a lot harder and more expensive to do a retrofit than it is to incorporate these changes in the initial construction. And again, three mile island was contained. Secondary storage worked. If these retrofits are expensive, they were evidently not necessary. > At 58% capacity factor with ~20% forced outage rates you are going to have many, long, correlated outages. Good thing nuclear power averages a capacity factor of over 90%! By comparison what's the capacity factor for solar and wind? 25% depending on geography. > Alsk [sic] keep in mind that on the list of reactor prices from 1968 to 1979, the prices went up the entire time. Your learning rate is negative even in the Nuclear boom. And again, you skew the timelines to fit your narrative. The nuclear boom started in 1965, and saw large price decreases from plants starting construction before then. That's the price drops brought about by the nuclear boom. Reactors continued to be cheap until three mile occurred and reactors that had started construction in the mid 70s had to deal with a whole ton of nuclear obstructionism. That's why price increases among reactors that started construction in the mid 1970s and later. Restrict the query to reactors completed before three mile island and there's no increase in cost. The chart I posted handily put those in a different color, but this is apparently not obvious enough for you.