> people will use the losses the nuclear incurs to subsidize renewables as a proof that nuclear is uneconomical, and that renewables beat it handily There is a
by threeseed 4y ago
> people will use the losses the nuclear incurs to subsidize renewables as a proof that nuclear is uneconomical, and that renewables beat it handily
There is already plenty of proof around the world that renewables are cheaper than nuclear.
- mensetmanusman 4y agoNot if you calculate in the cost of wanting to have a nuclear weapons and submarine fleet…
- Krssst 4y agoMaybe cheaper as of today if we don't account for storage, but since buulding renewables use far more materials than nuclear, would fossil fuels which ensured cheap production and transport become lacking, or base materials extraction not being able to follow a rising demand, I am not sure it would still be the case.
- TheOtherHobbes 4y agoIf nuclear used fewer raw materials nuke plants wouldn't be huge - huge - capital projects, wouldn't take years to come online, and wouldn't have huge cleanup costs. If the money spent on nukes had been spent on renewables and on developing storage we wouldn't have these problems. This was predictable decades ago. The reality is that nukes are a political solution to a political problem. It's nice that they sometimes generate energy for a while, but there is no sense in which they've ever been a rational economic choice.
- mathiasgredal 4y agoNuclear uses roughly an order of magnitude fewer ressources than wind, without factoring in storage: https://imgur.com/a/Kc2h21O https://imgur.com/a/Kc2h21O. Source: https://www.energy.gov/sites/prod/files/2017/03/f34/quadrennial-technology-review-2015_1.pdf https://www.energy.gov/sites/prod/files/2017/03/f34/quadrenn... (page 390)
- Schroedingersat 4y agoYou can't use a report from 2015 citing data from 2010 as indicative of a technology that has dropped in cost 10-fold and nearly doubled capacity factor since then. Additionally the overwhelming majority of that material is foundation and tower. Both of which can be reused by replacing the nacelle.
- mathiasgredal 4y agoThe Vestas V112-3MW from 2009 has a 42% capacity factor. I don’t know any modern wind turbines that has a capacity factor of 80%. https://www.thewindpower.net/turbine_en_413_vestas_v112-3000.php https://www.thewindpower.net/turbine_en_413_vestas_v112-3000... https://en.m.wikipedia.org/wiki/Humber_Gateway_Wind_Farm https://en.m.wikipedia.org/wiki/Humber_Gateway_Wind_Farm
- Schroedingersat 4y agoAnd this makes the point. A 2009 model turbine is a huge improvement on a retrospective on past history of plants that had been running for some time in 2010 https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/V1123%2045MW_Mk3a_ISO_LCA_Final_31072017.pdf.coredownload.inline.pdf https://www.vestas.com/content/dam/vestas-com/global/en/sust... A V112 has 40% lower materials per TWh (or ~30% for the lower wind configuration) than your report without considering modular foundations which would drop it by another factor of 3 or being able to reuse the foundation and tower at least once which would drop it by another 2. On the other end you're not considering Uranium mining or enrichment facilities or waste storage or that the metals are all recyclable immediately rather than half of them being LLW or SLIW.
- mathiasgredal 4y agoAverage capacity factor is basically an irrelevant metric. What is more important is the lowest seasonal capacity factor, since seasonal power storage doesn’t make sense. For the UK this is 25% for offshore wind: https://onlinelibrary.wiley.com/cms/asset/bd2bb73a-ef25-4c4b-9d32-36c672a1695f/we2685-fig-0004-m.jpg https://onlinelibrary.wiley.com/cms/asset/bd2bb73a-ef25-4c4b... This means that we need to overbuild wind by >200%, to have the necessary power year round. Solar doesn’t work, since it is basically useless in the northern hemisphere during winter, and it needs a lot of battery storage during the night. There is also a week in February where there is no wind, which will require green methane production and gas peakers(edit: https://en.m.wikipedia.org/wiki/Dunkelflaute https://en.m.wikipedia.org/wiki/Dunkelflaute) Nuclear can work year round with load following using a design like the Natrium reactor. This design also uses a lot less concrete than traditional NPP’s.
- Manuel_D 4y agoNuclear plants use very little raw materials relative to the amount of power the produce. When built at scale, nuclear plants have been delivered at prices around $1-2 billion dollars per GW of capacity. The cheapest form of carbon-free energy really depends on what the objective is: small reductions in a mostly fossil-fuel grid? Or total replacement of fossil fuels? Renewables are great for the former: you can throw up some solar panels or wind turbines and reduce a chunk of fossil fuels use. But once you try to start delivering significant portions of the energy grid through intermittent sources the surplus energy starts to get wasted, and the effectiveness drops.
- Schroedingersat 4y agoNuclear is roughly equal to wind on a modular foundation if you account for the fact that the tower and foundation outlast the nacelle. The "$2/GW" nuclear reactors were all built by state run agencies with opaque budgets and in France's, Japan's, and South Korea's cases have all proved wildly unreliable in addition to having opaque public subsidy on top of the very large visible subsidies in the supply chain and finance. If you think it's possible to match the prices China reports that megaprojects cost, I'd like to see any examples of projects in the global north with auditable accounting matching their figures in hydro, or highways, or rail, or ports or... basically anything. In mediocre to good areas with something like the PEG racking system solar uses about the same raw material than nuclear already and it's almost all sand. By the time a new nuke came online this will be far less. Both are recyclable. 12 hour storage adds negligible mass and can easily cover daily variation. Intermittent power without storage can easily feed dispatchable loads like EV charging, chemical feedstock and heat production. These vastly exceed non-dispatchable electricity and can be used for virtual seasonal storage. There are only a small handful of areas best served by nuclear, and most of them have hydro or nuclear already. There's a narrow niche where nuclear is optimal: Grid electricity between 50% and 80% penetration in the 50% of areas where hybrid CSP + e-fuel backup isn't better. This niche is rapidly shrinking and could easily be gone by the time one is built. More carbon can be removed faster and with fewer resources by throwing renewables at the other 10 or so TW of fossil fuels currently being burnt. Until those resources are committed, new nuclear just delays things.
- CamperBob2 4y agoThey don't compete. Nuclear provides base load.
- Schroedingersat 4y agoThey both provide non-dispatchable power. Renewables have a slight edge at moderate penetration with no storage because you can turn them off whenever you want without incurring massive costs and solar output is biased towards peak time. Then there's hybrid PV-CSP which is available in about half of the world and is dispatchable. I guess you're probably right in that nuclear doesn't compete because hybrid CSP is vastly cheaper even in FOAK form and dispatchable power is superior.
- HyperSane 4y agoNuclear is dispatchable.
- Schroedingersat 4y agoNo it isn't. Ramping is slow and can't be done beyond 20% very often or you destroy your fuel and control rods Reducing output doesn't reduce costs, it increases them. This is the opposite of dispatchable. If you can only pay for your reactor by coercing people into buying daytime electricity for 20c/kWh rather than buying a solar panel that will pay for itself in 3 years then it's not dispatchable.
- Manuel_D 4y agoYou don't need to alter the thermal output of the reactor to modulate a nuclear plant's electrical output. You can more aggressively cool the reactor to reduce the energy delivered to the turbine. This isn't often done since it's essentially deliberately reducing the efficiency of the plant. > Ramping is slow and can't be done beyond 20% very often or you destroy your fuel and control rods 20% is all that's necessary to accommodate most load variations: https://www.eia.gov/todayinenergy/detail.php?id=42915 https://www.eia.gov/todayinenergy/detail.php?id=42915
- HyperSane 4y agoNot when you take intermittency into account.