Given that nuclear power plants are known entities and the list of "unknown unknowns" should be non-existent given their safety critical nature it simply is mis
by Gwypaas 4y ago
Given that nuclear power plants are known entities and the list of "unknown unknowns" should be non-existent given their safety critical nature it simply is mismanagement.
If your nuclear plant costs more than $33/MWh to operate then you are doing something wrong and stop trying to blame "the green movement", "privatization" or whatever.
- katbyte 4y agoso costs to build operate and maintain something never changes and is the exact same everywhere and in every country and if it’s different then what you think it’s “mismanagement”? Because I’m pretty sure it’s going to be different from France to America to poland
- Gwypaas 4y ago> The LCOE figures for existing Generation II nuclear power plants integrating post-Fukushima stress tests safety upgrades following refurbishment for extended operation (10-20 years on average): (in 2012 euros) €23/MWh to €26/MWh (5% and 10% discount rate). There, from a source extremely positively biased towards nuclear. https://world-nuclear.org/information-library/economic-aspects/economics-of-nuclear-power.aspx https://world-nuclear.org/information-library/economic-aspec... Putting the 2012 €23/MWh to €26/MW in an inflation calculator gives €26/MWh to €29/MWh.