Have a look at Flamanville 3 and then try to sell another 20 of those to the public. https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plant https://en.w
by Gwypaas 4y ago
Have a look at Flamanville 3 and then try to sell another 20 of those to the public.
https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plant https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...
- dividedbyzero 4y agoOops: > EDF estimated the cost at €3.3 billion[6] and stated it would start commercial operations in 2012, after construction lasting 54 months.[7] The latest cost estimate (July 2020) is at €19.1 billion, with commissioning planned tentatively at the end of 2022.[8][2] That's ten years late at 578% the projected cost.
- lolive 4y agoSubcontractors are extatic !