4 ms·
Does "one generation before current" count as "long tail", though? The chip shortage in products like cars has been for much simpler chips, AFAIK. The article
by NeverFade 4y ago
Does "one generation before current" count as "long tail", though?
The chip shortage in products like cars has been for much simpler chips, AFAIK.
The article says Apple, AMD, and Nvidia are looking to source from the new plant. Aren't they canonical examples of companies that are always looking for the latest and greatest? Why would they be interested in an prev-gen chip?
- rsj_hn 4y agoAutomotive industry is still using 90nm chips. It's not even the generation before the current one. They have long production runs and require stability, and they also prefer to use standardized parts across many production runs. Defense also uses older chips. Don't ask what kind of chips are in Amraam missiles or the F-35 -- although the F-35 is getting a technology refresh now (after a 14 year production run). Only in bleeding edge consumer devices does it make sense to keep changing chips. In other systems, production runs can last 20 years and the life of the asset can be 40 years or more, and you want the same spare parts available throughout the entire expected life of all assets produced. And then when you look at fixed assets, such as thermal power stations, then you are looking at even longer time horizons.
- NeverFade 4y agoThat's what I thought. If consumer products tend to use the bleeding edge, which will be the state-of-the-art chips produced in Taiwan, then I still don't get: 1. What's so exciting about a prev-gen fab possibly being completed in 2024? 2. Who will buy the chips produced by the 4nm Arizona fab, and why? The only plausible answer offered for 1 in this thread has been that it's too difficult to jump straight into the bleeding edge, and this is the most the US can do to lay the foundation for an eventual catch-up with the state of the art in chip fabrication.
- rsj_hn 4y agoLower end consumer electronics are fine with chips that aren't the absolute latest. The point isn't that they won't find buyers, but rather that they will earn less money building a fab in a location with much higher labor costs and producing chips that are a bit behind. My guess is that the decision to build fabs in the U.S. was the result of geopolitical strong-arming by the U.S., but TSMC will still find buyers and that the fab will at least pay for itself.
- bonestamp2 4y agoIf mission critical applications (military, automotive, aerospace) are using older chips, and smartphones/computers are using the latest, then everything else is using chips between those two extremes... computer peripherals, office machines, toys, audio/video systems, communication equipment, lights, HVAC, anything rechargeable. The list is massive, you name an industry and they will probably be buying 4nm over the next couple decades.
- walterbell 4y agoStarting in 2022, the high-volume iPhone has been switched to the N-1 generation SoC, while the bleeding edge SoC is reserved for the lower volume iPhone Pro/Max.
- rnk 4y agoBecause overall the us chip production capacity and technical reach has been reducing over time. We need to establish and pull over a much larger amount of production so our strategic needs can be met inside the us. This helps us avoid problems like our key sources being cut off or destroyed with our allies like Taiwan and South Korea, or China does more and more production and technical leadership and decides to squeeze us. Intel has sinking in at least technical leadership for a long time. It's obviously a priority a need for the us to on-shore more chip prod.
- bjourne 4y agoMany companies (including NVidia and AMD) are adopting chiplet designs for which different parts of the chip can be manufactured on different process nodes. The most performance critical aspects of chips will be manufactured on 3 nm nodes, but most of the chip will be manufactured on 4-10 nm nodes. It's too expensive (in cost/wafer) to use 3 nm for everything.
- easygenes 4y agoIt’s not just cost: a lot of elements have effectively hit serious diminishing returns below 7nm.
- mr_toad 4y ago> The article says Apple, AMD, and Nvidia are looking to source from the new plant. Aren't they canonical examples of companies that are always looking for the latest and greatest? CPUs and GPUs get all the press, but there are dozens of other chips used in even the latest models that use older technology. For all we know Apple could be buying those chips for USB cables, or pencils.