From Reddit, > Originally, TBC submitted an unsolicited proposal to build a tunnel for the county. This tunnel would cost $45 million (fixed). TBC pitched the
by Veedrac 4y ago
From Reddit,
> Originally, TBC submitted an unsolicited proposal to build a tunnel for the county. This tunnel would cost $45 million (fixed). TBC pitched the idea, and the board was sold, but wanted to expand the project. They split it into 3 phases, the first of which would be environmental impact assessments and other project management tasks. This was awarded to another contractor (not TBC), who designed a system involving a 24 foot diameter tunnel, effectively shutting TBC out of bidding (TBC uses 12 ft diameter tunnels). It is this project, designed by another contractor and completely unrelated to the thing TBC proposed, that blew up to a $500 million estimate. Part of the contract was that this company who did the proposal would also oversee the engineering of the final project, which is something TBC presumably wasn't interested in so they didn't bid.
https://www.reddit.com/r/BoringCompany/comments/z75yc0/comment/iy6dguh/ https://www.reddit.com/r/BoringCompany/comments/z75yc0/comme...