4 ms·
Pff it's IBM you buy the Consultant with it, he sits in the lower rack and has spacefood rations for 5 years, then you have to do maintenance and the consultant
by nix23 4y ago
Pff it's IBM you buy the Consultant with it, he sits in the lower rack and has spacefood rations for 5 years, then you have to do maintenance and the consultant get exchanged and retired.
But!! No shutdown needed.
- Our_Benefactors 4y agoCan they be put on a generator bike? I’m concerned about their carbon footprint.
- hyperdimension 4y agoWhat carbon footprint? The consultants are not much more than sequestered carbon! (A fancy insult, now that I think of it. Nice.)
- nix23 4y ago>carbon footprint. They have zeolite in the rack (like in the ISS). The food is also non methane producing.
- broodbucket 4y agoNonsense, there would be at least one more redundant consultant if not two. Seriously though, these machines call home when there's a hardware failure, they'll fail over and someone will show up to replace what failed. Enterprise tech is sometimes cool.
- nix23 4y ago>Nonsense, there would be at least one more redundant consultant if not two. Gosh you are right i always forget him. >Seriously though, these machines call home when there's a hardware failure, HP's EVA Device did that too, so sometimes a Engineer calls you and ask's if "we" have time to update the firmware, not even HP engineers are allowed to do EVA updates...just specialized EVA ones.