Gantt charts can be made in MS Project, Google Sheets,: https://en.wikipedia.org/wiki/Gantt_chart https://en.wikipedia.org/wiki/Gantt_chart Critical path metho
by westurner 4y ago
Gantt charts can be made in MS Project, Google Sheets,: https://en.wikipedia.org/wiki/Gantt_chart https://en.wikipedia.org/wiki/Gantt_chart
Critical path method > Basic techniques: https://en.wikipedia.org/wiki/Critical_path_method#Basic_techniques https://en.wikipedia.org/wiki/Critical_path_method#Basic_tec... :
> Components: The essential technique for using CPM [8][9] is to construct a model of the project that includes the following:
> (1) A list of all activities required to complete the project (typically categorized within a work breakdown structure), (2) The time (duration) that each activity will take to complete,
(3) The dependencies between the activities and,
(4) Logical end points such as milestones or deliverable items.
> Using these values, CPM calculates the *longest path* of planned activities to logical end points or to the end of the project, and *the earliest and latest that each activity can start and finish without making the project longer.* This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer). In project management, a critical path is the sequence of project network activities which add up to the longest overall duration, regardless if that longest duration has float or not. This determines the *shortest time possible to complete the project.\
"*
Re: [Hilbert curve, Pyschedule, CSP,] Scheduling of [OS, Conference Room,] and other Resources
https://news.ycombinator.com/item?id=31777451 https://news.ycombinator.com/item?id=31777451 https://westurner.github.io/hnlog/#comment-31777451 https://westurner.github.io/hnlog/#comment-31777451
Complexity and/or Time estimates can be stuffed into nonexclusive namespaced label names on GitHub/GitLab/Gitea:
#ComplexityEstimate:
C:1
C: Fibonacci[n]
C: (A), J, Q, K, (A)
#TimeEstimate:
T:2d
T:5m
#Good First Issue
GitLab EE and Gitea have time tracking on Issues and Pull Requests.
Gitea has untyped Issue dependency edges, but there could probably easily be another column in the is-it-a through table for the many-to-many Issue edges table to support typed edges with URIs i.e. JSONLD RDF.
GitLab Free supports the "relates to" Linked Issue relation; EE also supports "blocks"/"is blocked by".
Planning poker: https://en.wikipedia.org/wiki/Planning_poker https://en.wikipedia.org/wiki/Planning_poker
Agile estimation: https://www.google.com/search?q=agile+estimation https://www.google.com/search?q=agile+estimation
"Agile Estimating and Planning" (2005) https://g.co/kgs/kDScM7 https://g.co/kgs/kDScM7
- yodon 4y agoCPM sounds a lot like a PERT chart, which was invented in the 1950's to help design and build the Polaris nuclear submarines during the Cold War[0]. PERT has been part of Microsoft Project for decades, so it's readily available. When you really need it (like in the case of tens of thousands of people trying to build and ship a single project at lighting speed) PERT is an extremely powerful and effective project management methodology. If, on the other hand, your "project management division" is you, it's a dangerously seductive time sink that will consume huge amounts of your time building and tuning and gathering and updating data and information, for arbitrarily close to zero direct real benefit and huge net negative benefit. The increase in effectiveness you gain from all that modeling is, in software development projects, negligible and the cost of doing all that modeling is much higher than you think it will be if you've never done it (that's why we don't do waterfall planning in software - it's not that no one's thought of it, it's that it's not effective on projects of any real complexity). As with any approach to planning, PERT works best at a particular scale and project type, and it's typically a quite large scale non-software project. In my personal opinion, from a software development standpoint, the valuable part of building a PERT chart is doing the work and thinking required to draw a dependency map for your tasks. Drawing all those lines to show what has to be done before what is an incredibly effective tool for helping you flesh out and find dependencies (tasks) you hadn't realized needed to be on your list. Use something like MS Project to build that dependency diagram, then force yourself to stop using Project because it's too seductive at making you feel like the data is giving you power when it's really just consuming your brainpower ineffectively. Use dependency mapping to build a waterfall caliber understanding of what you need to build, then set it aside and use more appropriate agile style approaches to actually work through the project in an optimum manner (which often means not building it in exactly the way you mapped out originally). [0]https://en.m.wikipedia.org/wiki/Program_evaluation_and_review_technique https://en.m.wikipedia.org/wiki/Program_evaluation_and_revie...
- westurner 4y agoWBS: Work Breakdown Structure: https://en.wikipedia.org/wiki/Work_breakdown_structure https://en.wikipedia.org/wiki/Work_breakdown_structure PERT -> see also -> "Project network" https://en.wikipedia.org/wiki/Project_network https://en.wikipedia.org/wiki/Project_network : > Other techniques: The condition for a valid project network is that it doesn't contain any circular references.* > Project dependencies can also be depicted by a predecessor table. Although such a form is very inconvenient for human analysis, project management software often offers such a view for data entry. > An alternative way of showing and analyzing the sequence of project work is the design structure matrix or dependency structure matrix. design structure matrix or dependency structure matrix: https://en.wikipedia.org/wiki/Design_structure_matrix https://en.wikipedia.org/wiki/Design_structure_matrix READMEs, Issues, Pull Requests, and Project Board Cards may contain Nested Markdown Task Lists with Issue (and actual Pull Request) # references: - [ ] Objective - [x] Task 1 +tag - [ ] #237 (GitHub fills in the Title and Open/Closed/Merged state and adds a *hover card*) - [x] Multiline Markdown list item indentation <URL|text|> - ID#: - Title: - Labels: [ ] - Description: | - htps://URL#yaml-yamlld - [x] Multiline Markdown list item indentation w/ --- YAML front matter delimiters --- - id: - title: - labels: [ ] --- - htps://URL#yaml-yamlld Time management > Setting priorities and goals > The Eisenhower Method: https://en.wikipedia.org/wiki/Time_management#The_Eisenhower_Method https://en.wikipedia.org/wiki/Time_management#The_Eisenhower... : | | Important | Not important | Urgent | | Not Urgent | From "Ask HN: Any well funded tech companies tackling big, meaningful problems?" https://news.ycombinator.com/item?id=24412493 https://news.ycombinator.com/item?id=24412493 : > https://en.wikipedia.org/wiki/Strategic_alignment https://en.wikipedia.org/wiki/Strategic_alignment ... "Schema.org: Mission, Project, Goal, Objective, Task" https://news.ycombinator.com/item?id=12525141 https://news.ycombinator.com/item?id=12525141