Presumably not all of them are engineers. There must be an operational side we're not seeing that consumed a lot of resources. > 7400x0.8x30 hours a week= 177
by barbazoo 4y ago
Presumably not all of them are engineers. There must be an operational side we're not seeing that consumed a lot of resources.
> 7400x0.8x30 hours a week= 177 600 man hours a week.
Is that what the 0.8 is about?
- MichaelZuo 4y agoAssuming half of the man hours are spent doing operations, sales, accounting, HR, etc., work, that's still nearly 90000 man-hours a week spent doing engineering. > Is that what the 0.8 is about? Yes