3 ms·
I was wondering the same thing -- how could one measure my productivity? (as a software engineer) The best connection I could think of is something related to
by shtopointo 4y ago
I was wondering the same thing -- how could one measure my productivity? (as a software engineer)
The best connection I could think of is something related to the company output, but in a market downturn I could be working 12 hour days, and the company would still be doing worse...