3 ms·
Kepco release figures they claim are the costs (but probably not including cost of the loan or a bunch of other things). They're also far lower capacity factor
by Schroedingersat 4y ago
Kepco release figures they claim are the costs (but probably not including cost of the loan or a bunch of other things).
They're also far lower capacity factor than the US (whether that's a symptom of lower reliability or of lower costs permitting curtailment is a different matter) and we know of at least two instances of cost cutting and forgery on safety critical parts.
- missedthecue 4y agoKepco is shutting down a lot of nuclear plants too. I think at least half are slated to be shut down permanently over the next few years
- Schroedingersat 4y agoThey're going with the netherlands/russian model of milking other countries' taxpayers now that the local well has run dry.