3 ms·
Australia is constructing the Snowy River 2 pumped hydro setup. Initial cost estimate was $AU 3 Bn, it's now headed toward $AU 6 Bn plus a connector that could
by sien 4y ago
Australia is constructing the Snowy River 2 pumped hydro setup.
Initial cost estimate was $AU 3 Bn, it's now headed toward $AU 6 Bn plus a connector that could also cost billions.
https://reneweconomy.com.au/snowy-2-0-hit-by-another-blow-out-in-costs-and-consumers-will-foot-the-bill/ https://reneweconomy.com.au/snowy-2-0-hit-by-another-blow-ou...