4 ms·
The same applies to building new LNG terminals, drastically increasing the storage capabilities for renewable energy, and making the power grid sufficiently res
by BjoernKW 4y ago
The same applies to building new LNG terminals, drastically increasing the storage capabilities for renewable energy, and making the power grid sufficiently resilient to be able to entirely rely on renewable energy.
Those measures take years to decades to materialise to a significant degree. Still, all those measures are currently being implemented, and rightfully so.
In comparison, developing a new fracking site from a mere technical point of view takes less than a year.
That's not to say we should do one or the other or prefer fracking over renewables. However, when the alternatives are to either continue to be at the mercy of a potentially hostile power or to use less environmentally friendly energy sources (such as coal or lignite) or to accept regular power outages as a consequence, simultaneously exploring all possible better avenues (including nuclear energy, which as mentioned is still readily available right now) is pretty much a no-brainer.
- adrianN 4y agoUnfortunately, both for fracking and renewables, technical problems are the least of your concern when you want to build anything in Germany.