4 ms·
I have a feeling it might be the routing to the hss/pcrf that could have been the isue. Almost every carrier has redundancy for these products and they are ofte
by Maven911 15y ago
I have a feeling it might be the routing to the hss/pcrf that could have been the isue. Almost every carrier has redundancy for these products and they are often in geographically distinct areas. Perhaps the routing from the eNodeBs/edge network to the core network was handled by another division within Verizon or even leased from a third party and could have caused all of this
Or a disgruntled employee left a cron job on all the key systems to rm -rf :-)