4 ms·
> for day to day stuff there is no way I’m gonna pull another engineer in to run through these steps. which of those besides #3 requires day-to-day interaction
by sigstoat 4y ago
> for day to day stuff there is no way I’m gonna pull another engineer in to run through these steps.
which of those besides #3 requires day-to-day interaction with another engineer?
and i'd expect #3 to fall out of sprint planning, or just talking with your coworkers about your work.