3 ms·
The operative word here is onshore, for a variety of reasons, like the absence of road/tunnel/bridge permits, neighborhood Karen councils and local politicians,
by cm42 4y ago
The operative word here is onshore, for a variety of reasons, like the absence of road/tunnel/bridge permits, neighborhood Karen councils and local politicians, having to manage multiple lease arrangements, etc, etc.
I read an industry article mid-COVID that claimed the biggest barrier to offshore right now was the lack of ships to install them - alleviated somewhat by the introduction of floating offshore rigs, like these:
https://www.x1wind.com/ https://www.x1wind.com/
So yeah, it's gotta be way cheaper to drop a couple of those in the ocean than truck towers out to middle-of-nowheresville or digging a foundation at the bottom of the ocean or whatever.
- tuatoru 4y agoThanks for that X1Wind tetrahedron link - I saw a similar one recently that used a truncated pyramid construction, with the blades rotating between the front and back pairs of legs. Interestingly with these size is not the be-all and end-all. If you make them so that they fit in the average port (towed by an average pair of tugs), the range of locations where they can be installed increases a lot. As does the availability of ships usable for the install.