4 ms·
Yes this is correct. batch 16 7.9s / 25 steps, per image 0.49s: it generates 16 images for each prompt within 7.9s, so it's 0.49s per image.
by ipiszy 4y ago
Yes this is correct.
batch 16 7.9s / 25 steps, per image 0.49s: it generates 16 images for each prompt within 7.9s, so it's 0.49s per image.
- PresentHarmony 4y agoThank you indeed, my friend!
- PresentHarmony 4y agoOne more question, if you don't mind. 1 image is generated in 0.7 seconds (25 steps ) and the same single image with 50 steps will be generated in 1.3 seconds. So it's much cheaper to generate more images for the same promt. Am I right or am I missing something ? Thanks in advance for your answer. P.S. Though it should be 1.4 seconds. 0.7*2=14.If you think twice the speps, twice the time.