2 ms·
The Samsung gear I worked on would take about 10 min to come back up, give or take. I know because I dropped a handful of sites when I did power testing - visua
by Aloha 4y ago
The Samsung gear I worked on would take about 10 min to come back up, give or take. I know because I dropped a handful of sites when I did power testing - visual inspection was not always enough to verify if the power was wired correctly. Most of them came back up in 10 min.. well, except once there was one site that didn't come back because the Microwave didn't like the power hit, lol - that required another tower crew to revisit and hang a new RRU.
I just can't imagine power design is that different, I'm used to these cabinets even in urban areas having 4 strings of batteries in them, are they only building sites with a single string in europe?