3 ms·
Part of it is identifying the bottleneck. You verified the chef wouldn’t be it, but the tables ended up being the limiting factor. And say you installed 200 ta
by bombcar 4y ago
Part of it is identifying the bottleneck. You verified the chef wouldn’t be it, but the tables ended up being the limiting factor.
And say you installed 200 tables, but only get ten customers an hour - now the bottleneck is the input and that likely has to be solved by marketing or something exterior.
And maybe you get that fixed and now have 200 tables an hour, wnd discover your dishwasher can only handle 50 tables an hour. So you need more dishes (buffer) but that will only help until the poor dishwasher is washing dishes 24/7 and at that point the buffer will eventually run out.
Successfully modeling the system and identifying the point at which it will fail is useful, because then you can keep an eye on that point AND know if something unexpected is causing it to fail earlier.