2 ms·
I don't think those really relate to each other that way. The lead time and design time for a complex device, especially one with such high vertical integration
by oneplane 4y ago
I don't think those really relate to each other that way. The lead time and design time for a complex device, especially one with such high vertical integration is much longer than the whole debate on repairs has gone public.
Switching a product from a front-to-back stack to a mid frame design with nearly no interchangeable structures between those designs takes multiple years.