Let's look at the cost of providing synthetic baseload in France with wind + solar + batteries + hydrogen, using real weather data to drive the optimization pro
by pfdietz 4y ago
Let's look at the cost of providing synthetic baseload in France with wind + solar + batteries + hydrogen, using real weather data to drive the optimization problem:
https://model.energy/ https://model.energy/
Using 2011 weather data and 2030 cost assumptions (some of which are already met), we get 71 euro/MWh. That's much better than what Flamanville 3 is going to be delivering. Inclusion of hydrogen reduces that cost from 93.1 euro/MWh. Many arguments against renewables assume batteries are to be used instead for long term smoothing, which is a poor choice.
2030 cost assumptions are appropriate because any new nuclear plant started now isn't going to be available before then. Ignoring the cost trajectory of renewables and storage is another common mistake of nuclear advocates, a mistake that nuclear investors cannot allow themselves to indulge in. Indeed, they likely are looking even further ahead, as that nuclear plant has to operate until 2070 or so.