3 ms·
They mean that it requires a cnc operator, and that it's not usually required in building houses, which is a pretty huge added cost.
by emilfihlman 4y ago
They mean that it requires a cnc operator, and that it's not usually required in building houses, which is a pretty huge added cost.
- kitd 4y agoFrom which you can subtract the cost of the brick/cement/block manufacturer.
- throwaway4aday 4y agoWouldn't that be equivalent to the plywood manufacturer? This still adds an additional processing step where you take a mass produced construction material and make a specialized product out of it which you then use to build the house instead of just going straight from material to construction.