3 ms·
Seems to be 2 issues: Engine 3 is not properly being conditioned through the bleed process, and engineers are troubleshooting. Teams also are assess
by 1970-01-01 4y ago
Seems to be 2 issues:
Engine 3 is not properly being conditioned through the bleed process, and engineers are troubleshooting.
Teams also are assessing what appears to be a crack in the thermal protection system material on one of the flanges on the core stage. The flanges are connection joints that function like a seam on a shirt, are affixed at the top and bottom of the intertank so the two tanks can be attached to it.