3 ms·
The article mentions 300MW, which is a large connection to be sure but not unheard of. At that size it would be a scheduled load, like the pumps at a pumped hy
by caf 4y ago
The article mentions 300MW, which is a large connection to be sure but not unheard of. At that size it would be a scheduled load, like the pumps at a pumped hydro station or the potlines at an aluminium smelter.