>Reminder that the initial plan was 130 miles of track laid by 2018. They are at 0.0 miles. This is a bit of a disingenuous take. There is a significant amount
by ac29 4y ago
>Reminder that the initial plan was 130 miles of track laid by 2018. They are at 0.0 miles.
This is a bit of a disingenuous take. There is a significant amount of work to be done before tracks get laid. There are dozens of active construction projects right now including building bridges, viaducts, overcrossings and grade separations. Actually laying the high speed track is probably one of the last things they'll do (there's no value in having tracks laid until a substantial section can be laid without gaps).