3 ms·
> The thing is that maybe around 1% of the joules can be replaced with nuclear. Citation needed. These plants are running now. Are you saying the electricity
by timmg 4y ago
> The thing is that maybe around 1% of the joules can be replaced with nuclear.
Citation needed.
These plants are running now. Are you saying the electricity they are generating is not being used? The question is what replaces those joules if they shut them down?
- _ph_ 4y agoThey are providing like 6% of the German electricity. So yes, replacing them will require more fossil fuel short time. On the other side, the idea is to replace them with renewal sources. Germany is already at 50 renewables in the electricity mix. Nuclear is not really a replacement for gas, rather than coal, due to its slow nature. Gas power plants are used in Germany mostly for quick peak power.
- Arnt 4y agoMost of the gas isn't used for generating electricity. Rather, it's used at the point where the electricity would be used. If you build a house you can install a furnace that gets joules from the electricity network or from the gas network, see? And there are a little over ten million houses and apartments that get their warm water and heating from gas-heated boilers/furnaces. See https://www.haustec.de/heizung/waermeerzeugung/waermemarkt-waechst-gasheizungen-bleiben-die-beliebteste-heiztechnologie https://www.haustec.de/heizung/waermeerzeugung/waermemarkt-w... for example. There's also the chemical industry, which uses gas as chemicals, not as a source of joules.
- Arnt 4y agoI think I misunderstood your question. The plants are running now, but that doesn't make them able to replace gas. Most of the gas can't be replaced by them for the reasons in my other response, but I think your question was about the rest? The rest is because of the different traits of nuclear and gas-fired power plants. Nuclear power plants aren't adjustable, they provide the same amount of power, day and night, plodding on, with only very slow adjustments. Gas is the opposite. Gas-fired power plants are easy to adjust on very short notice, to match the unexpected changes in demand. If you try to replace quick-changing power plants with slow-changing, the network's frequency (50Hz in Germany) suffers. When demand shrinks and the slow-changing power plant can't adapt, the frequency rises above 50Hz. When demand rises quickly, the opposite happens. Some adjustment is possible by involving other entities than just the two, so it's not quite 0%.